|
scpl185
Demolition of a building in downtown Santa Cruz after the 1989 earthquake
|
scpl189
A workman in a cherry picker fixes power lines in downtown Santa Cruz
|
scpl197
A man addresses a crowd from a ledge on the town clock
|
|
scpl198
Workers, machinery, and curved metal pipes assembled in a parking lot near Cedar St.
|
scpl199
Workers use a crane to move metal rods to assemble the temporary pavilions
|
scpl200
Assembly of the temporary pavilions, looking towards the backs of the closed-off buildings on Pacific Avenue
|
|
scpl245
A Christmas tree is carried in a basket by a crane somewhere near a damaged building and a memorial statue after the 1989 earthquake.
|
WD-004
City workers using a crane on the Riverside Avenue bridge to try to loosen a log jam.
|
|
|