0225
20-inch feed pipe is about to be laid along the entire length of Barrett Ranch (off River and Encinal) for the Santa Cruz city reservoir.
|
SCM048
Santa Cruz Water Works.
|
WD-001
The River Street Water Treatment Plant, the City's first water treatment plant, at 124 River Street.
|
|
WD-002
Construction of pipelines to carry water from the Tait Street wells, under the San Lorenzo River, to the River Street Water Treatment Plant at 124 River Street.
|
WD-003
Pipes to be laid under the San Lorenzo River to carry water to the River Street Water Treatment Plant (seen here).
|
WD-009
Construction of the filter gallery at the Graham Water Treatment Plant.
|